2015-04-13-18482-Service Request - Re-run rescheduling for EMEA (Jeff by 2015-04-16) #ProductionBreakFix #SDSupportARUN
2015-04-13 - 18482 - Service Request - Re-run Rescheduling for EMEA
Problem Summary
Re-run rescheduling to recover from the network issue on Saturday April 11, 2015.
Admin Info
Purpose
|
Re-run Rescheduling for EMEA
|
Requested by
|
Jeffrey Mau
|
Issue Date
|
04-13-2015
|
Resolved by
|
Surya Basa
|
Resolved Date
|
04-14-2015
|
Document Status
|
Complete
|
Detailed Problem Description
(Include Screen Shots if required )
The PRD system was down for some reason on April 11, 2015 as a result of which the rescheduling job was affected. The job which consists of 13 steps didn't complete and the job log was not updated after 4/11 after 8.58 AM. The job was partially completed till step 5 leaving out Mexico and EMEA plants including the other steps.
Solution Analysis and Recommendations
(Include Screen Shots if required)
The system failure caused the job to become inactive and hence was cancelled.
Set up a new job with the missed steps to reschedule the open items.The first step to include the materials should be included for selection input.
Resolution
A new job RESCHEDULING_REMAINING STEPS with the Mexico and EMEA plants was set up and kicked off in background. The open items were rescheduled and details were logged in the spool.
The job failed at step 7 for a DB issue but this didn't have any impact on the open items as both the correction report and the ARUN steps are run daily in the ARUN jobs for all the regions.
Release Information
Provide link here to Release Notes if Technical Objects were changed
NA